Upward movement of soil material in the base of a cofferdam or excavation because of groundwater pressure; normally associated with insufficient toe penetration of sheeting. Also called Blowout, Boiling, Piping.
We use cookies to personalize content, ads, to provide social media features and to analyze our traffic, by clicking "Ok" or continuing to use the site, you are agreeing to our use of cookies as described in our Privacy policy.Ok